Jan 29 2025 11:47AM: [1] WILL HAVE TO CLOSE EAST BOUND LOUISE FOR 45 MIN
Jan 29 2025 11:48AM: [4] BIG RIG TRUCK AND TLR
Jan 29 2025 11:48AM: [5] TLR BROKEN IN HALF/ LOAD 1125
Jan 29 2025 11:48AM: [8] TRAFFIC CURRENTLY GOING THRU ON SINGLE LANE
Jan 29 2025 11:50AM: [10] ** WILL AFFECT THE TRAFFIC ON Interstate 5 AT LOUISE
Jan 29 2025 11:52AM: [12] * SOUTH BOUND Interstate 5 AT LOUISE OFF RAMP [Shared]
Jan 29 2025 12:08PM: [13] [Notification] [CHP]-LATHROP POLICE DEPARTMENT DISPATCH — PER THEIR LT — THEY WILL BE SHUTTING DOWN NORTH BOUND 5 ON LOUISE OFF RAMP [Shared]
Jan 29 2025 12:21PM: [17] [Notification] [CHP]-CRANE ARRIVED // STARTING TO SHUT DOWN EAST BOUND TRAFF ON LOUISE // SOUTH BOUND OFF RAMP ALREADY BACKED UP TO FRWY [Shared]