Mar 18 2025 6:40AM: [2] HIT POWERLINES
Mar 18 2025 6:40AM: [3] BIG RIG
Mar 18 2025 6:41AM: [7] DRIVER GETTING OO BIG RIG
Mar 18 2025 6:41AM: [8] 1125 BOTH LANES
Mar 18 2025 6:42AM: [11] 1039 BUTCO FIRE DEPARTMENT [Shared]
Mar 18 2025 6:42AM: [12] [Appended, 06:43:37] [1] BUTSO TRANSITION ROAD
Mar 18 2025 6:42AM: [13] [Appended, 06:43:37] [2] BIG RIG TRAFFIC COLLISION INTO TELEPHONE POLE
Mar 18 2025 6:43AM: [14] [Appended, 06:43:37] [3] 20 ADDITIONAL VEHICLES PULLED OVER ITA
Mar 18 2025 6:46AM: [17] [Appended, 06:47:49] [1] BUTSO TRANSITION ROAD
Mar 18 2025 6:47AM: [19] [Appended, 06:47:49] [3] PUMP TRUCK BIG RIG HAULING CEMENT
Mar 18 2025 6:48AM: [23] 1125 BOTH LANES [Shared]
Mar 18 2025 6:50AM: [28] FIRE DEPARTMENT ADVSING 2 MINS OUT [Shared]
Mar 18 2025 6:50AM: [29] LE 1039 FIRE DEPARTMENT CPZ ALL [Shared]
Mar 18 2025 6:54AM: [34] CAL FIRE DEPARTMENT CONFIRMED POWERLINES DOWN [Shared]
Mar 18 2025 6:54AM: [37] 60 RQST ROADWAY SHUT DOWN NORD HIGHWAY AT MERDIAN // 80 CPZ [Shared]
Mar 18 2025 6:55AM: [39] 1039 PGE WILL CB WITHESTIMATED TIME OF ARRIVAL [Shared]
Mar 18 2025 6:56AM: [40] PER 90 OWNER INTERSECTION 97 // RQT 1185R HD [Shared]
Mar 18 2025 6:58AM: [42] 1039 BUTTE COUNTY ROADS [Shared]
Mar 18 2025 7:00AM: [45] PER 90 ADVS COUNTY ROADS CLOSURE MAY BE FOR A WHILE // MAY NEED CLOSURE SIGNS [Shared]
Mar 18 2025 7:01AM: [47] PER PGE ESTIMATED TIME OF ARRIVAL 15 MINS [Shared]
Mar 18 2025 7:36AM: [55] ALL STAR WCB WEST ESTIMATED TIME OF ARRIVAL
Mar 18 2025 7:39AM: [56] [Notification] [CHP]-PER ALL STAR 60-90 MIN ESTIMATED TIME OF ARRIVAL [Shared]
Mar 18 2025 9:50AM: [60] [Notification] [CHP]-Problem changed from 1179-TRAFFIC Collision-1141 EN ROUTE to Traffic Collision No Injuries [Shared]
Mar 18 2025 9:50AM: [61] 60 98 ROADWAY CLEAR // SOLO VEHICLE 1182 [Shared]