Traffic Hazard Us101 North / Sherwood Oc

Mar 23 2025 2:07PM: [1] LOW HANGING WIRES OVER NORTH BOUND LNS // UNKNOWN IF OVER SOUTH BOUND LNS

Mar 23 2025 2:07PM: [2] BIG RIG JUST CLRD

Mar 23 2025 2:08PM: [5] 1039 MTYR COMM

Mar 23 2025 2:21PM: [15] [Notification] [CHP]-FIRE DEPARTMENT DEPARTMENT CHEIF – CHP DISCRETION ON SHUTTING DOWN FWY, LINES ARE 1-2 FET LOWER THAN THE OVER PASS – POSSIBLE – OR – POSSESSION COULD BE STRUCK BY BIG RIG TKS

Mar 23 2025 2:23PM: [17] 73A TRAFFIC BREAK LED BY OFFICER STARTED SOUTH BOUND AND WILL ADVS

Mar 23 2025 2:29PM: [20] 73A LINE INTERSECTION COMM LINE // REQUEST – OR – REQUIRED START ATandT CONNECTED TO POWER POLE // SOUTH BOUND #2 IS OPEN LINE IS ABOVE BOTTOM OF BRIDGE SOUTH BOUND #1 IS BELOW AND 73A CLOSING #1 // BTH NORTH BOUND LNS BELOW BRIDGE

Mar 23 2025 2:32PM: [22] 1039 ATandT

Mar 23 2025 2:33PM: [25] 30A STARTING TRAFFIC BREAK LED BY OFFICER

Mar 23 2025 2:37PM: [28] 73A NORTH BOUND AND SOUTH BOUND BIG RIGS ARE ABLE TO PASS // VERY CLOSE ON NB SIDE// TFRC CONTINUING FOR NOW //

Mar 23 2025 2:37PM: [29] 27-S2 CONTINUE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) // AND 73A REQUEST – OR – REQUIRED ESTIMATED TIME OF ARRIVAL IF EXTENDED REQUEST – OR – REQUIRED CT

Mar 23 2025 2:39PM: [30] ATandT TICKET #PE54Q895 // APROX ESTIMATED TIME OF ARRIVAL 4 HOURS

Mar 23 2025 2:43PM: [34] 27-S2 HAVE THEM START FOR A HARD CLOSURE FOR NOW

Mar 23 2025 2:47PM: [37] 27-S2 OPEN UP ALL LANES OF TRAFF , BIG RIGS ARE ABLE TO GET BY STILL, OFCR WILL WILL OVERSEE TRAFF

Mar 23 2025 2:49PM: [39] 27-S2 BIG RIGS ARE ABLE TO TO GET BY WITH 2-3 FLAT TIRE OF CLEARANCE WILL HAVE A UNIT MONITOR REQUEST – OR – REQUIRED, ESTIMATED TIME OF ARRIVAL FOR PGandE AND ATTandT

Mar 23 2025 2:51PM: [41] PER MTRY COM PGandE ESTIMATED TIME OF ARRIVAL OF 40 MIN , 15 AGO

Mar 23 2025 3:03PM: [45] A27-030 BIG RIG TRUCK HAS A 1FT CLEARNEACE

Mar 23 2025 3:55PM: [46] CALTRANS 97, WIRE INTERSECTION ABOVE BRIDGE , REQUEST – OR – REQUIRED IF CHP WANTS THEM TO START STAGING, IF THEY ARE CALLED OUT LATER IT WILL TAKE THEM LONGER IT WILL TAKE LONGER TO SET UP

Mar 23 2025 3:59PM: [47] 1039 27-S2 – MAY BE A GOOD IDEA , REQUEST – OR – REQUIRED TO CHECK WITH 30 IF THERE INTERSECTION ANY MOVEMENT IN THE WIRES – WHEN B SHIFT GOES 10-8 WILL TRY TO GET AN UPDATED ESTIMATED TIME OF ARRIVAL F/ AT andT

Mar 23 2025 4:00PM: [48] A27-030 LOTS OF WIND IN THE AREA MAY CAUSE MORE MOVEMENT , POSSIBLE – OR – POSSESSION WAS THE CAUSE EARLIER OF THE LINES DROPPING , REQUEST – OR – REQUIRED CAL TRANSITION ROAD STAGE

Mar 23 2025 4:01PM: [49] 1039 CAL TRANSITION ROAD

Mar 23 2025 4:02PM: [51] 1039 27-S2

Mar 23 2025 4:20PM: [52] ATandT EN ROUTE , ESTIMATED TIME OF ARRIVAL 45 MIN

Mar 23 2025 5:03PM: [55] A27-030 AT andT TECH INTERSECTION GOING TO CALL CONSTRUCTION COMPANY TO RESPOND TO START THE WORK ESTIMATED TIME OF ARRIVAL 2 HOURS

Mar 23 2025 7:03PM: [60] [Notification] [CHP]-PER CALTRANS – ADVSD 1097 // ATT DETERMINED NOT THEIRS // ADVSD ONE INTERSECTION WAVE FIBER OPTICS AND UNKN OTHER CABLES

Mar 23 2025 7:58PM: [66] PER 30 NEG CTRANS UNIT IN AREA