Cozeep-assist With Construction State Route 14 South / Ave K

Aug 4 2025 5:59PM: [1] CLOSURE OF FULL FWY FROM AVE K TO AVE M

Aug 4 2025 5:59PM: [2] CLOSURE FROM 1900-0400

Aug 4 2025 6:00PM: [3] 2ND CLOSURE NORTH BOUND 14 AT AVE L TO AVENUE INTERSTATE – (IE – I15) FROM 2100-0600

Aug 4 2025 6:00PM: [4] 2ND CLOSURE FULL FWY

Aug 4 2025 7:11PM: [5] SOUTH BOUND CLOSURE IN PLACE

Aug 4 2025 9:13PM: [7] NORTH BOUND CLOSURE IN PLACE FROM AVENUE L TO AVENUE INTERSTATE – (IE – I15)

Aug 5 2025 3:02AM: [10] SOUTH BOUND CLOSURE PICKED UP

Aug 5 2025 3:06AM: [11] NORTH BOUND 14 FROM AVE H TO AVE A # 2 LANE CLOSED

Aug 5 2025 5:45AM: [12] NORTH BOUND CLOSURE HAS BEEN PICKED UP FROM AVE L TO AVE INTERSTATE – (IE – I15)

Aug 5 2025 10:23AM: [13] PER 89-040A CONES NEED TO BE SET UP AT AVENUE H / VEHICLES FOLLWING BIG RIGS

Aug 5 2025 10:25AM: [14] COPIES // SET UP ADDL CONES AT BEGINNING OF TAPERING CLOSURE AT AVE H / N29 COPIES ALL

Aug 5 2025 10:43AM: [15] PER N28 THE #2 LANE WILL REMAIN CLOSED FRM AVE H TO AVE A AND WILL CONTACT CHP FOR TRAFFIC TRAFFIC BREAK LED BY OFFICER LATER WHEN RDY TO PICK UP CLOSURE – KEEP LOG OPEN