Dec 27 2025 3:39AM: [2] BLACK DODG CHAL VERSUS POWER LINE
Dec 27 2025 3:40AM: [3] POWER LINE INTERSECTION HANGING ABOVE ON RAMP
Dec 27 2025 3:40AM: [4] BLOCKING DODG AND BIG RIG TRUCK BLKG LNS
Dec 27 2025 3:41AM: [6] PTY OO VEHICLE
Dec 27 2025 3:43AM: [11] TRANSFERRED TO SJS FIRE DEPARTMENT
Dec 27 2025 3:46AM: [12] C24-089 97 BLOCKING ENTIRE ON RAMP
Dec 27 2025 3:57AM: [17] 24-S9 LINE DOWN AND BLOCKING // NEED TO RESPOND
Dec 27 2025 4:02AM: [20] 1039 ATT — ADVISE NEG LOCATION FOR THEM
Dec 27 2025 5:53AM: [29] [Notification] [CHP]-Problem changed from Traffic Collision Unknown Injuries to Traffic Collision No Injuries
Dec 27 2025 7:19AM: [32] 1039 COMCAST WILL SEND TECHNICIAN TO GO CHK TO SEE IF ITS THEIR POLE
Dec 27 2025 7:20AM: [34] **COMCAST LOG — JB72037643 — WILL CB FOR ESTIMATED TIME OF ARRIVAL **
Dec 27 2025 7:21AM: [35] 24-S8 ON RAMP CLOSED
Dec 27 2025 7:21AM: [36] 24-S8 — EAST BOUND MONTX ON RAMP TO SOUTH BOUND 880 CLOSED
Dec 27 2025 7:28AM: [39] 1039 PGandE WILL CB WITH ESTIMATED TIME OF ARRIVAL
Dec 27 2025 7:28AM: [40] BOTH PGandE AND COMCAST – UNKNOWN IF ITS THEIR POLE OR NOT – BOTH EN ROUTE
Dec 27 2025 7:34AM: [42] 24-S8 ITS A COM/CABLE LINE – POLE NEG COMPROMISED AT ALL – 4 FLAT TIRE OFF GROUND
Dec 27 2025 7:44AM: [46] 1039 COMCAST – ALREADY AWARE OF POWER OUTAGE – EN ROUTE
Dec 27 2025 8:20AM: [47] 24-S8 REQUEST – OR – REQUIRED CALTRANS FOR HARD CLOSURE
Dec 27 2025 8:32AM: [49] 1039 DOTCC
Dec 27 2025 10:27AM: [53] Incident 251227GG0151 was reopened. Comment: Incident Reopened : 24-S8 LANDLINE REQUEST – OR – REQUIRED ESTIMATED TIME OF ARRIVAL FRM COMCAST
Dec 27 2025 10:32AM: [55] LANDLINE COMCAST FOR ESTIMATED TIME OF ARRIVAL
Dec 27 2025 10:37AM: [56] 1039 COMCAST – THEY DO NOT OWN THE POLES – ANY IN CALIFORNIA , WILL SEND SOMEONE OUT TO CHK ON THE EQUIPMENT ON THE POLES, UNKNOWN ESTIMATED TIME OF ARRIVAL
Dec 27 2025 10:41AM: [57] 1039 PGandE CPZ WILL SEND SOMEONE BUT SINCE THEYRE COM LINES, ITS PROBABLY ATT OR COMCAST
Dec 27 2025 12:10PM: [61] [Notification] [CHP]-COMCAST LANDLINE SPOKE WITH MANAGER WILL HAVE TECHNICIAN COME OUT AND INVESTIGATE ISSUE // WILL CB WEST/ ESTIMATED TIME OF ARRIVAL
Dec 27 2025 12:50PM: [63] [Notification] [CHP]-PER COMCAST ESTIMATED TIME OF ARRIVAL 20 MIN