Aug 6 2024 7:57AM: [2] 76-S4 #1 LANE CLOSED FROM DILLON TO A HALF MILE EO DILLON FOR ASPHAULT REPLACEMENT
Aug 6 2024 8:05AM: [3] 76-S4 #2 CLOSED // #1 LANE OPEN
Aug 6 2024 8:43AM: [4] 76-S4 1021 SILVERADO AND REQUEST – OR – REQUIRED ESTIMATED TIME OF ARRIVAL // HEAVY DUTY EN ROUTE FOR OWNERS REQUEST – OR – REQUIRED BIG RIG IN CONSTRUCTION AREA FOR BAD CLUTCH
Aug 6 2024 8:44AM: [5] 5 MIN ESTIMATED TIME OF ARRIVAL FOR SILVERADO
Aug 6 2024 9:09AM: [7] 76-S4 76-21 RUNNING BREAKS IN BOTH DIRECTIONS TRYING TO GET THE BIG RIG TURNED AROUND IN CENTER DIVIDE BACK TO TA
Aug 6 2024 9:12AM: [9] 76-S4 TRFC TRAFFIC BREAK LED BY OFFICER RELEASED