Nov 12 2024 10:47PM: [1] S3 HAS VIS OF 1126/1125 AT THE GORE POINT OF THE OFF RAMP
Nov 12 2024 10:47PM: [2] BLOCKING THE OFF RAMP
Nov 12 2024 10:52PM: [4] C26-250 250 BIG RIG X2
Nov 12 2024 10:53PM: [5] C26-250 THE BIG RIG INTERSECTION SUPPOSE TO HAVE A BAD ORDER (NOT FUNCTIONING) ENG COMPANY EN ROUTE WITHPOTENTIAL PRIV ASSIST
Nov 12 2024 10:54PM: [6] C26-250 S3 ANY WAY THE RIG CAN MOVE FURTHER OFF SHERIFF’SOUTH DEPARTMENT NO LONGER 1125 IT MAY CAUSE A TRANSMISSION
Nov 12 2024 10:54PM: [7] C26-250 NOT ABLE TO MOVE IT WILL CHK IF 1185 HD INTERSECTION NEEDED
Nov 12 2024 10:58PM: [10] C26-250 1185 HD – RIG WEIGHS 80,000 LBS
Nov 12 2024 10:58PM: [12] S3 RUNNING TRAFFIC TRAFFIC BREAK LED BY OFFICER//30B WILL BE SETTING OUT FLARES
Nov 12 2024 10:59PM: [13] C26-250 1039 CHAZ TOW EN ROUTE WITHHD
Nov 12 2024 11:00PM: [14] C26-250 S3 // SHUTTING DOWN #2 LANE TIL 1185 GOES 97
Nov 12 2024 11:15PM: [16] S3 THE NORTH BOUND 1 AT STATE PARKING PROBLEM OFF RAMP INTERSECTION SHUT DOWN -RIG 1125 ON THE OFF RAMP
Nov 12 2024 11:27PM: [17] 26-S3 ESTIMATED TIME OF ARRIVAL FOR 1185?
Nov 12 2024 11:29PM: [18] 26-S3 1039 CHAZ ESTIMATED TIME OF ARRIVAL 20 MINS
Nov 12 2024 11:39PM: [19] S3 // 1185 97
Nov 12 2024 11:58PM: [20] 26-S3 #2 AND OFF RAMP ARE NOW OPEN