Mar 29 2025 6:08AM: [1] ALL LANES CLOSED DUE TO OVERTURNED BIG RIG TRUCK BLOCKING BOTH LANES
Mar 29 2025 8:59AM: [2] ^CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) CHANGEABLE MESSAGE SIGN SIGN “USE BOX CANYON AS ALT ROUTE FOR EAST BOUND 10 AS OF 0709
Mar 29 2025 9:01AM: [3] ^@0729 EAST BOUND AT 86 CLOSED // EB AT DILLON CLOSED
Mar 29 2025 10:43AM: [4] ^ ESTIMATED TIME OF ARRIVAL TO OPEN LANES 45 MINS // TRUCK INTERSECTION GONE // NEEDS TO RESET ALL K RAILS AND PICK-UP TRUCK UP THE DEBRIS
Mar 29 2025 11:08AM: [5] ^ STARTING TO OPEN UP EAST BOUND LANES ON THE 86 AND DILLON
Mar 29 2025 11:11AM: [6] ^ALL WEST BOUND LANES ARE OPEN
Mar 29 2025 11:11AM: [7] ^ DILLON ON RAMP OPEN WORKING ON THE SPLIT